I respectfully submit that such a tact may be easy to rally in smaller offices (which I'm getting the impression your type of office is, no dis meant), though small is such a relative term.
We have 250 +/- CADD Operators; probably a medium sized operation. The tactics you suggest are not practical when trying to corral this many cats.
![Smiley :)](http://www.theswamp.org/Smileys/black/smiley.gif)
Finally, relying on someone else to catch my errors, i.e. the QC guy, is not an efficient way to do things (scary actually, imagine if all of engineering did that
![shocked :shock:](http://www.theswamp.org/Smileys/black/shocked.gif)
), it costs more to go back to fix something, but that's just my opinion, your mileage and experience may vary.
![Smiley :)](http://www.theswamp.org/Smileys/black/smiley.gif)