Does the height of the components effect how the walls clean up? So if I have 3 foundation walls with different components. I have one wall style that has a footing and 8" wall components. I have another wall style that has a footing and 4" Stem w/ a 4" slab ledge 4" down from the top of the wall style. I have another wall style that has a footing, 4" slab ledge 4" down from the top of the wall style , 4" Stem and 4" slab ledge 4" down from the top of the wall style.
Now I want to make them work together. Is this possible?