Its a top down hierarchy
when there are numerous CUIX's loaded, the Double Click Actions (along with most other things in the cuix's) are given preference based on the load order of the cuix they are contained in.
So, if there are 3 partial cuixs loaded, each with different double-click actions, only the first partial cuix will load its respective double-click actions and the other two will be ignored?
no they will activate in order top down..until it runs out of them (that's the theory any way)
also they must be defined correctly or they wont work, so that might make it appear that lower in the tree cui/partial cui don't work
Ugh, what a pain.
OK. I must have defined them incorrectly then.
So, by that understanding, as the enterprise, main, and partial cui files are loaded, as long as a feature isn't added for that one particular action (eg. double-click for a circle), then it will load the first one it finds. Correct?