I have a railroad project that we are replacing some mainline track, extending siding track 1 and replacing some track on siding track 2.
Currently I have a alignment along the CL of siding track 1 as this is the track with the most work taking place. I then created a Misc alignment for a small portion of track along the mainline track (15'o/s rt of siding 1).
What I would like to do is only have 1 set of cross section views but show the corridor from 3 different alignments.
If that makes sense?