This thread will track the progress of a portion of an EDMS. In this segment, I'll create a database from Access, and link AutoCad attributes to it. Basically, an AutoCad drawing will drive the project to fruition. The database will be shared by other off-site employees who will be able to create and print out invoices / reports / drawings (pdf) / materials / quotes (for proposals), and other project related information.
Note: This will be a sloooow process, and please point out if there are better ways of doing this as I only know enough about this stuff to make me a little dangerous.