Hopefully someone can make some sense of this. When I modify a structure Rim type from Standard to a R-1234. I then open the pipe network in Storm Sewers to perform my calcs. I then update my network and my structure where I initially was R-1234 is now Standard again. Am I missing something on how this is suppose to work? Thanks for any help!
-
Hopefully someone can make some sense of this. When I modify a structure Rim type from Standard to a R-1234. I then open the pipe network in Storm Sewers to perform my calcs. I then update my network and my structure where I initially was R-1234 is now Standard again. Am I missing something on how this is suppose to work? Thanks for any help!
How are you 'round tripping' your data?
Do you have the the proper parts list set in XML settings?
-
what are your pipe network feature settings?
-
and...
-
Second one.... Using the STM file.
-
I need to dig out the settings tomorrow... Then I can compare too what your have.
-
Am I missing something on how this is suppose to work?
how it is supposed to work and how it actually works are diametrically opposite
-
I need to dig out the settings tomorrow... Then I can compare too what your have.
I didn't say mine were right; for your situation
just pointing you at what and where you may have to adjust for desired results.