A project here, from receiving the submittal specs to issuing as-builts, can take from 2 months to 6 months. This includes initial design, submittal approval, creation of shop drawings, to final as-built drawings. Naturally, there's a lull in there during construction, but even then, we often get called in for review and clarification. Total drafting/design time is usually around 2 weeks to 2 months, spread over the duration of the project, and depending on the size and scope of the project. We often have anywhere from 3 to 6 projects running at any given time. Anyone interested in moving to Missouri and lending a hand?