I was trying to standardize my file for generating the CSV files in Excel. The 2nd tab with the corrected data is generated with formula's.. to avoid getting "0" for empty cells. The largest drawing set we've had to date was just under 1300 drawings.. so I carried the formula's to row 1300
in this set 103 DWGs.. so yes ~1200 blank rows.
Hoping to use this file repeatedly.. just dropping in the project log data on tab "Sheet1" and hopping to tab "Sheet2" and immediately saving to CSV.
Thank you for the code update.