Around these parts we have the line work and any static info (client name, address, project name, date issued, etc...) in a title block drawing that is then xref'd into the drawings that get plotted. There is a separate block with attributes that gets inserted into each drawing that contains things like drawing scale, drawn by, checked by, drawing name, drawing number, etc... for things that vary from one drawing to the next within the project.