Hello everyone.
I am lost with this draw order process when I had more objects on different layers.
The process should arrange the objects from High / Above to Below as per their layer names.
Layer name: Object type:
layer-A Line,Circle
layer-B *Text
layer-C Polyline,Block Reference
layer-D *Text
is this possible?
Thank you.