I can't qualify the Deployment package that uses all 1.7 GB with 1.2 GB of content instead of just the 4-500 MB core application repairs. Add 10 minutes for the service pack after the install too.
Using the same program, the same license server, the same serial number, the same installation location, it refuses to recognize itself with the service pack merged with the deployment.
That is in no way resembling the use of a dishwasher. It's like rebuilding the Hoover Dam because the paint was chipped.