Author Topic: Block to Schedule link  (Read 2440 times)

0 Members and 1 Guest are viewing this topic.

McRojo the Irishman

  • Guest
Block to Schedule link
« on: August 24, 2004, 08:18:44 PM »
Howdy y'all!

I'm sure I've seen this at some point in some manner.  I've done a search but don't quite know the proper key words to find it.

I have, in floorplans, an attributed block containing (for example) a room name, number, wall finish, ceiling finish, and floor finish.  Another drawing contains the schedule for room material specifications.  Is there a way to set up a schedule to automatically write the information contained in the block?

I am familair with hyperlinks (if anyone remembers my hyperlink hunt a few years back) but am not sure that I can specify a block in a drawing with a hyperlink.  Is this the right path or...