I tend to be anal and over-detail my drawings. As long as I can meet budget, I'm happy.
Then there is the usual Contract language that "Things not shown shall be considered as similar to things that are shown, and the lack of detail shall not be construed as to letting the Contractor off the hook for anything and everything" or something like that.
Bob G.