CAD Forums => Vertically Challenged => Topic started by: StykFacE on February 10, 2011, 10:02:08 AM
-
I recently started diving into teaching myself the procedures in utilizing Projects, setting up Constructs, Elements, Views, and Sheets. I have to say, I love it and I already see how much I've been missing out on. We're about to get a huge multimillion dollar job awarded to us and I want to utilize the full extent of a Project but before I do I have a Quality Control/Standard of Procedure question.
Is it better set save all Projects files in a single directory? Or can I have the Project files in the separate job directories that are assigned on the network?
Right now, probably like a lot of companies, we have on our network a hierarchy of directories for each job. Housed inside each directory we have a folder for CAD Drawings, Shop Drawings, Submittals, POs, etcetera. I would like to keep the Project files in each job folder if I can but would like to hear from a veteran's POV first. Thanks in advance.
- TZF
-
If you utilize projects I seem to remember you had to have a certain hierarchy because it saves XML files that in them to tell it how to link drawings together. If I remember correctly
-
If you utilize projects I seem to remember you had to have a certain hierarchy because it saves XML files that in them to tell it how to link drawings together. If I remember correctly
Yeah I'm aware of the XML files attached to the DWG file hierarchy. I was just wondering if it's good practice to keep all projects in one folder, or in separate folders.
-
each project to it's own folder
-
each project to it's own folder
Thanks!!