I'm asking this question because I know someone who says he draws full CD's by hand in 3 days. This is after all design work is done. Therefore I'd assume that his elevations are also complete or near completion.
What I mean by full CD's is Title sheet, floor plans, elevations, details (fireplace, etc.), sections, roof plan, not framing; except floor trusses (second level), electrical. No mechanical or engineering needed.