basically, I'm trying to save my job ass here. What they want me to do is not what I want to do, but I feel like I'm HAVING to do it, or I can go look for another job. See, around here engineering is slowing down, so they look for odd ended jobs to keep us going (keep us off overhead) until bigger jobs come along.
I feel the same way you do. But I'm at my wits end when I really don't know how else to do what they're intending to desire as an end product. I personally believe they are making me mangle and shred these drawings to pieces. But what should I care? If the client is willing to pay for it, then by all means. It doesn't matter what and how we do things normally. This is not a normal situation. Problem is, only that it takes a long time to strip each dwg, then plug in the desired processes. I figured I could at least save myself some time by having a routine that help me do what I want to do.
So in closing: What does it matter to you WHY i'm doing this? They know I'm stripping the dwg of all the layers. That's what they want. I simply don't know how to do it more effectively than the way I'm doing it now...