This is for Site Data calculations:
Cell B7 has the Total Building Area value:
Cell B7 contents: 17,544 Sq. Ft. (derived from a field that gets a polyline's area)
Cell B12 has the Required Parking value which is derived from the Total Building area minus 4000 and then divided by 400:
Cell B12 contents: =(B7-4000)/400
Cell B12 value should end up being "33.86" (taken from excel)
Cell B12 value shows "43.79"
Any ideas on the mix up?