The company I work implementing BIM technology, using Revit, Civil, Navisworks.
As a basis we take the standard
"AEC UK BIM Standard for Revit v1.0"But we've got a lot of questions on working with large projects...
The standard model offers a separate part of the files and merge different sections as references.
we have a problem with families who are in different categories such as:
A door belongs to the architects and they can edit it many times - the material, color and markings. But opening the door and belongs to designers who need to do at this time reinforcing the wall ...
2 Pump Water belongs to the engineers, the engine - electricians.
3 Such examples are many, how to organize the work?
ps. I very much want to talk on implementing BIM for large civil engineering projects.