I have 2 open drawings and let the user show entities in the current drawing.
The program calculates new objects and must fill the resultate in the second drawing.
Is ist possible to write to the second drawing???
I used lock of target document but nevertheless
I always get "WRONG DATABASE".
What's the trick ?
Thanx